Rack clad building assembled in 2022 in Bélgica for our client Stow.
Data of the work:
Weight: 1400Tn.
Height: 41,5m.
Duration: 20 weeks.
Rack clad building assembled in 2022 in Bélgica for our client Stow.
Data of the work:
Weight: 1400Tn.
Height: 41,5m.
Duration: 20 weeks.